According to the environmental protection laws and policies of construction projects, the environmental protection facility completion acceptance information of Zhejiang Huachuan Industrial Group Co., Ltd. thermal power plant boiler room technical transformation Yinan Industrial Park central heating project is disclosed as follows:
Project name: Zhejiang Huachuan Industrial Group Co., LTD thermal power plant boiler room technical transformation Yinan Industrial Park central heating project
Construction unit: Zhejiang Huachuan Industrial Group Co., LTD
Location: Thermal power plant of Zhejiang Huachuan Industrial Group Co., LTD., No. 20, Baiguo West Road, Chian Town, Yiwu City
Construction content: Zhejiang Huachuan Industrial Group Co., Ltd. uses the south side of the coal farm and about 10000m2 of new land to build a 130t/h coal-fired circulating fluidized bed boiler, while the existing public facilities are shared according to demand. After the completion of the boiler steam through the heating pipe network to Yinan Industrial Park heating.
Information disclosure period: January 5 to February 4, 2018
The public can log on to http://uawq.cn/ query the project completion inspection and acceptance monitoring of the environmental protection facilities (survey) report complete summary report, environmental supervision and acceptance. If the public has comments and suggestions on the construction project, it can be reflected to the following units within the publicity period, and please leave contact information (name, address, telephone or email) to reflect the problem in order to get timely feedback.
1. Acceptance monitoring (investigation) unit, Tel: 0086-571-89975391
2. Environmental Supervision unit, Tel: 0086-571-87999821
3. Zhejiang Huachuan Industrial Group Co., LTD., Tel: 0086-579-85776507
Attachment:
Environmental supervision summary report
Zhejiang Huachuan Industrial Group Co., LTD
January 5, 2018